PERIODIC DUE DATE ASSIGNMENT WITH FAMILY SETUPS

Küçük Resim Yok

Tarih

2019

Dergi Başlığı

Dergi ISSN

Cilt Başlığı

Yayıncı

Univ Cincinnati Industrial Engineering

Erişim Hakkı

info:eu-repo/semantics/closedAccess

Özet

In this study we consider a single machine due date assignment problem involving dynamic job arrivals and family setups. The due date quotation process is based on periodically generating schedules of new and old jobs. We want to keep the tardiness of old jobs below an allowable threshold while minimizing total completion time of new arriving jobs. We propose a mixed integer linear programming formulation to solve the scheduling problem. We also present a function to quote due dates for new jobs. An experimental analysis is conducted to analyze the proposed due date quotation process under various shop and solution procedure parameters. Three performance measures are considered: average quoted lead time, average tardiness, number of setups perfouned. The first significant outcome of our analysis is that existence of family setups plays a crucial role; the second significant observation is that batching plays a double-edged sword role in due date management.

Açıklama

Anahtar Kelimeler

Scheduling, Due Date Assignment, Lead Time Quotation, Family Setup, Mixed İnteger Programming, Single-Machine, Resource-Allocation, Times, Algorithms, Cost

Kaynak

International Journal of Industrial Engineering-Theory Applications and Practice

WoS Q Değeri

Q4

Scopus Q Değeri

Cilt

26

Sayı

6

Künye